Integration

New circuits ordered early, live before the TSA runs out.

Carrier contracts often belong to the seller and carrier lead times do not care about your exit date. We design the new network, source circuits and SD-WAN across our partner network of 320+ providers, and manage every order and install so sites come up on the company’s own agreements on time.

Where it shows up in a deal

The longest lead time in the integration is often a circuit

New fiber is rarely quick. A standard install can run for months, and a site that needs construction, permits or landlord access can take longer still. Ordered as early as the deal allows, it can be live well before the TSA ends; ordered late, an extension can become the only option.

In diligence

Site, circuit and contract inventory: what is in the seller's name, what can be assigned, what expires when, and what each site actually needs. Lead times go straight into the integration timeline.

Day One

Sites stay on the seller’s network under the TSA, with traffic between the two businesses restricted where the agreement requires it. Assignments of the seller’s circuits are in negotiation and replacement orders are already in flight.

Post-close

Installs, SD-WAN deployment and cutovers managed site by site, with the seller's circuits disconnected on schedule and the invoices stopped.

What we deliver

Design, source, install, manage

Through our partner network we quote every site across the carriers that actually serve it, and we manage the order from signature to turn-up.

Network design

WAN, LAN and wireless design for the separated company: bandwidth from measured use, redundancy where the business needs it, and a standard the next site can follow.

Circuit sourcing

Dedicated internet, broadband, Layer 2, dark fiber, fixed wireless and 5G backup quoted across 320+ providers, with contract terms negotiated for assignability and exit.

SD-WAN and SASE

Carrier-independent SD-WAN with secure access built in, so sites can change providers without changing the network, and remote users get the same protection as the office.

Order and install management

Every order tracked, every install escalated when the carrier slips, and site readiness coordinated with the landlord and the local team.

Cutover and decommission

Site-by-site cutovers with rollback, old circuits disconnected on the date the TSA allows, and final invoices reconciled.

Mobility and expense management

Mobile fleet, IoT connectivity and telecom expense management brought under one set of contracts and one invoice review.

How we run it

Order early, install on schedule, cut over cleanly

01

Inventory and design

Sites, circuits, contracts and requirements captured; target design agreed. Output: a sourcing list with lead times on the integration plan.

02

Source and contract

Competitive quotes from the partner network, terms negotiated, orders placed. Output: signed orders and confirmed install dates.

03

Install and deploy

Order management, SD-WAN deployment, site readiness. Output: new connectivity tested at every site.

04

Cut over and close

Cutovers, disconnects and invoice reconciliation. Output: the company on its own agreements, the seller’s circuits gone.

Why SubjectData

Carrier leverage a single portfolio company rarely has on its own

A single company negotiating one site has no leverage. Our partner network quotes every site across the providers that serve it, and the providers know we will be back with the next deal.

Related

Where this connects

Partner network

The providers behind every quote.

UCaaS and contact center

Voice that moves with the network.

Separation and integration

Connectivity as a workstream on the separation plan.

Sites on the seller's circuits?

Send us the site list and the TSA term. We will tell you which circuits can be assigned, what the market is charging for the rest, and when each site can be live.